ITAC Assessment: KU0260
ITAC logo
ITAC Assessment: KU0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PVC SIDING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 30,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,765 6,286,929
kWh
Natural Gas $12,894 3,195
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,030 $500 $2,030
50,703
kWh
02 2.2511: Insulate bare equipment $1,114 $1,550 $1,114
27,843
kWh
03 2.4133: Use most efficient type of electric motors $21,888 $2,000 $21,888
546,893
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,971 - $1,971
49,238
kWh
05 2.8121: Apply for tax-free status for energy purchases $12,051 - $12,051
-
kWh
06 2.4221: Install compressor air intakes in coolest locations $1,642 $1,100 $1,642
41,032
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,314 $250 $1,314
32,825
kWh
TOTAL RECOMMENDED $42,010 $5,400 $42,010
748,534
kWh
TOTAL IMPLEMENTED $29,959 $5,400 $29,959
748,534
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs