ITAC Assessment: KU0257
ITAC logo
ITAC Assessment: KU0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ALUMINUM CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,410
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,804 10,930,539
kWh
Natural Gas $190,821 66,567
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,987 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,214

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,773 $2,670 $3,773
106,096
kWh
- -
02 2.1123: Install automatic stack damper $2,887 $4,800 - $2,887
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $2,063 $750 $2,063
58,030
kWh
- -
04 2.4312: Improve lubrication practices $2,456 - $2,456
69,168
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,026 - - $2,526
-
MMBtu
$(-500.0)
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,636 $1,700 $1,636
46,014
kWh
- -
07 2.7221: Lower temperature during the winter season and vice-versa $146 - $83
2,345
kWh
$63
-
MMBtu
-
TOTAL RECOMMENDED $14,987 $9,920 $10,011
281,653
kWh
$5,476
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $11,214 $7,250 $6,238
175,557
kWh
$5,476
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs