| Assessment Year | 1988 |
|---|---|
| Principal Product | MEAT PROCESSING |
| NAICS |
n/a
|
| SIC | 2011: Meat Packing Plants |
| Sales Range | $10 M to 50M |
| # of Employees | 58 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $88,195 | 2,075,029 |
kWh
|
$0.043 |
| Natural Gas | $35,708 | 10,787 |
MMBtu
|
$3.31 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,326 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,584 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7251: Reduce air conditioning load by evaporating water from roof | $411 | $3,100 |
$411
9,672
kWh
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,591 | - | - |
$1,741
-
MMBtu
|
$(-150.0) | |
| 03 | 2.1222: Install turbulators | $1,010 | $350 | - |
$1,010
-
MMBtu
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,305 | - |
$1,305
42,497
kWh
|
- | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $288 | - | - |
$288
-
MMBtu
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $331 | $55 |
$331
7,913
kWh
|
- | - | |
| 07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $390 | $705 |
$473
11,137
kWh
|
$(-83.0)
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $5,326 | $4,210 |
$2,520
71,219
kWh
|
$2,956
-
MMBtu
|
$(-150.0) | ||
| TOTAL IMPLEMENTED | $4,584 | $1,055 |
$1,778
53,634
kWh
|
$2,956
-
MMBtu
|
$(-150.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs