Assessment Year | 1999 |
---|---|
Principal Product | rubber brake diaphragms |
NAICS |
n/a
|
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
50,000
ft2
|
Annual Production | 20,500,000
pieces
|
Production Hrs. Annual | 8,112
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,482 | 8,017,585 |
kWh
|
$0.026 |
Electricity Demand | $120 | 114,567 |
kW-mo/yr
|
$0.001 |
Natural Gas | $66,883 | 16,379 |
MMBtu
|
$4.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,792 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,896 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,988 | $5,439 |
$2,054
79,426
kWh
|
$934
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,239 | - |
$882
33,998
kWh
|
$357
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $139 | $45 |
$97
3,810
kWh
|
$42
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $3,355 | - |
$2,387
92,321
kWh
|
$968
-
kW-mo/yr
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,757 | $2,000 | - | - |
$6,757
-
MMBtu
|
- | |
06 | 3.4154: Eliminate leaks in water lines and valves | $314 | $60 | - | - |
$203
-
MMBtu
|
$111
-
Tgal
|
|
TOTAL RECOMMENDED | $14,792 | $7,544 |
$5,420
209,555
kWh
|
$2,301
-
kW-mo/yr
|
$6,960
-
MMBtu
|
$111
-
Tgal
|
||
TOTAL IMPLEMENTED | $6,896 | $2,045 |
$97
3,810
kWh
|
$42
-
kW-mo/yr
|
$6,757
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs