| Assessment Year | 1988 |
|---|---|
| Principal Product | INDUSTRIAL FANS |
| NAICS |
n/a
|
| SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
n/a
|
| Annual Production | 200,000
pieces
|
| Production Hrs. Annual | 3,000
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $163,683 | 2,069,168 |
kWh
|
$0.079 |
| Natural Gas | $90,915 | 24,260 |
MMBtu
|
$3.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,890 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,130 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,183 | $6,000 |
$1,183
14,947
kWh
|
- | - | |
| 02 | 2.5194: Redesign process | $4,705 | $2,080 |
$185
2,345
kWh
|
- | $4,520 | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $2,538 | $4,920 | - |
$2,538
-
MMBtu
|
- | |
| 04 | 2.2531: Re-size charging openings or add movable cover or door | $1,965 | $3,600 | - |
$1,965
-
MMBtu
|
- | |
| 05 | 2.5194: Redesign process | $1,692 | $1,200 |
$1,692
21,395
kWh
|
- | - | |
| 06 | 2.1123: Install automatic stack damper | $1,519 | $1,800 | - |
$1,519
-
MMBtu
|
- | |
| 07 | 2.7243: Improve air circulation with destratification fans / other methods | $1,236 | $1,500 |
$(-69.0)
(-879)
kWh
|
$1,305
-
MMBtu
|
- | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $928 | - | - |
$1,328
-
MMBtu
|
$(-400.0) | |
| 09 | 2.4312: Improve lubrication practices | $788 | - |
$788
9,965
kWh
|
- | - | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $487 | $500 |
$487
6,155
kWh
|
- | - | |
| 11 | 2.6121: Reduce hot water temperature to the minimum required | $107 | - |
$70
879
kWh
|
$37
-
MMBtu
|
- | |
| 12 | 2.2444: Use hot process fluids to preheat incoming process fluids | $6,742 | $11,500 | - |
$6,742
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $23,890 | $33,100 |
$4,336
54,807
kWh
|
$15,434
-
MMBtu
|
$4,120 | ||
| TOTAL IMPLEMENTED | $12,130 | $15,480 |
$1,856
23,447
kWh
|
$6,154
-
MMBtu
|
$4,120 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs