Assessment Year | 1987 |
---|---|
Principal Product | PRINTERS, BOOKS, PUBLICITY MATERIAL |
NAICS |
n/a
|
SIC | 2731: Books: Publishing, or Publishing and Printing |
Sales Range | $1 M to 5M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 756,000
pieces
|
Production Hrs. Annual | 1,820
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,857 | 836,460 |
kWh
|
$0.063 |
Natural Gas | $8,538 | 2,332 |
MMBtu
|
$3.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,984 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,978 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $5,811 | $300 |
$3,096
48,945
kWh
|
$2,715
-
MMBtu
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $516 | - |
$666
-
kWh
|
- | $(-150.0) | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $392 | - | - |
$542
-
MMBtu
|
$(-150.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $410 | $79 |
$410
6,448
kWh
|
- | - | |
05 | 2.1222: Install turbulators | $318 | $500 | - |
$318
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $222 | $50 |
$222
3,517
kWh
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $172 | $50 | - |
$172
-
MMBtu
|
- | |
08 | 2.6121: Reduce hot water temperature to the minimum required | $143 | - | - |
$143
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $7,984 | $979 |
$4,394
58,910
kWh
|
$3,890
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | $6,978 | $429 |
$3,728
58,910
kWh
|
$3,400
-
MMBtu
|
$(-150.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs