ITAC Assessment: KU0236
ITAC logo
ITAC Assessment: KU0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AUTOMOTIVE REPAIR TOOLS
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 4,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,285 1,526,964
kWh
Natural Gas $24,027 7,039
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,625 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,264

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,730 $8,946 $5,730
77,960
kWh
- -
02 2.1123: Install automatic stack damper $1,183 $1,700 - $1,183
-
MMBtu
-
03 2.6121: Reduce hot water temperature to the minimum required $1,055 - $1,055
14,361
kWh
- -
04 2.4312: Improve lubrication practices $905 - $905
12,309
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $725 - - $1,225
-
MMBtu
$(-500.0)
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $388 - $388
5,275
kWh
- -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $691 $1,000 $862
11,723
kWh
$(-171.0)
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $582 $120 $582
7,913
kWh
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $194 $40 $194
2,638
kWh
- -
10 2.4221: Install compressor air intakes in coolest locations $172 $120 $172
2,345
kWh
- -
TOTAL RECOMMENDED $11,625 $11,926 $9,888
134,524
kWh
$2,237
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $8,264 $9,186 $7,539
102,579
kWh
$1,225
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings