Assessment Year | 1987 |
---|---|
Principal Product | MEDICAL EQUIPMENT |
NAICS |
n/a
|
SIC | 3534: Elevators and Moving Stairways |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
n/a
|
Annual Production | 7,200
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,842 | 719,812 |
kWh
|
$0.065 |
Natural Gas | $14,128 | 4,364 |
MMBtu
|
$3.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,315 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,340 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.5194: Redesign process | $8,861 | $5,000 |
$229
3,517
kWh
|
$557
-
MMBtu
|
$8,075 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,771 | $4,019 |
$1,771
27,257
kWh
|
- | - | |
03 | 2.2511: Insulate bare equipment | $1,447 | $700 |
$1,602
24,619
kWh
|
$(-155.0)
-
MMBtu
|
- | |
04 | 2.7261: Install timers and/or thermostats | $1,030 | - |
$534
8,206
kWh
|
$496
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $667 | $275 |
$667
10,258
kWh
|
- | - | |
06 | 2.2514: Cover open tanks | $262 | $200 | - |
$262
-
MMBtu
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $125 | - | - |
$165
-
MMBtu
|
$(-40.0) | |
08 | 2.2437: Recover waste heat from equipment | $152 | $290 | - |
$152
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $14,315 | $10,484 |
$4,803
73,857
kWh
|
$1,477
-
MMBtu
|
$8,035 | ||
TOTAL IMPLEMENTED | $3,340 | $4,509 |
$2,305
35,463
kWh
|
$1,075
-
MMBtu
|
$(-40.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs