ITAC Assessment: KU0227
ITAC logo
ITAC Assessment: KU0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MEDICAL EQUIPMENT
NAICS
n/a
SIC 3534: Elevators and Moving Stairways
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area
n/a
Annual Production 7,200
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,842 719,812
kWh
Natural Gas $14,128 4,364
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,315 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.5194: Redesign process $8,861 $5,000 $229
3,517
kWh
$557
-
MMBtu
$8,075
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,771 $4,019 $1,771
27,257
kWh
- -
03 2.2511: Insulate bare equipment $1,447 $700 $1,602
24,619
kWh
$(-155.0)
-
MMBtu
-
04 2.7261: Install timers and/or thermostats $1,030 - $534
8,206
kWh
$496
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $667 $275 $667
10,258
kWh
- -
06 2.2514: Cover open tanks $262 $200 - $262
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $125 - - $165
-
MMBtu
$(-40.0)
08 2.2437: Recover waste heat from equipment $152 $290 - $152
-
MMBtu
-
TOTAL RECOMMENDED $14,315 $10,484 $4,803
73,857
kWh
$1,477
-
MMBtu
$8,035
TOTAL IMPLEMENTED $3,340 $4,509 $2,305
35,463
kWh
$1,075
-
MMBtu
$(-40.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs