ITAC Assessment: KU0222
ITAC logo
ITAC Assessment: KU0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product TRUCK LIGHTING EQUIPMENT
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 285
Plant Area
n/a
Annual Production 30,000,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,975 1,904,455
kWh
Natural Gas $52,005 16,357
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $4,214 - - $4,214
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,908 $2,400 $2,908
40,739
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,488 - - $1,488
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $879 $1,500 $879
12,309
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $536 $600 - $536
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $481 $700 $481
6,741
kWh
-
07 2.4312: Improve lubrication practices $209 - $209
2,931
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $105 $30 $105
1,465
kWh
-
TOTAL RECOMMENDED $10,820 $5,230 $4,582
64,185
kWh
$6,238
-
MMBtu
TOTAL IMPLEMENTED $10,075 $4,630 $4,373
61,254
kWh
$5,702
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs