| Assessment Year | 1987 |
|---|---|
| Principal Product | KITCHEN,BATHROOM CABINET |
| NAICS |
n/a
|
| SIC | 2511: Wood Household Furniture, Except Upholstered |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
n/a
|
| Annual Production | 135,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $50,225 | 994,138 |
kWh
|
$0.051 |
| Natural Gas | $54,662 | 12,387 |
MMBtu
|
$4.41 |
| Other Energy | $21,600 | 3,834 |
MMBtu
|
$5.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $35,637 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,663 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,637 | $6,098 |
$23,637
467,761
kWh
|
- | - | - | |
| 02 | 2.7226: Use computer programs to optimize hvac performance | $7,806 | $9,000 | - |
$7,806
-
MMBtu
|
- | - | |
| 03 | 2.1123: Install automatic stack damper | $1,126 | $1,800 | - |
$1,126
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,126 | $93 |
$1,126
22,274
kWh
|
- | - | - | |
| 05 | 2.7494: Install storm windows and doors | $303 | - | - |
$953
-
MMBtu
|
- | $(-650.0) | |
| 06 | 2.8223: Add air shields to trucks to increase fuel mileage | $648 | - | - | - |
$648
-
MMBtu
|
- | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $502 | $200 |
$281
5,569
kWh
|
$221
-
MMBtu
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $326 | $600 |
$326
6,448
kWh
|
- | - | - | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $163 | - |
$163
3,224
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $35,637 | $17,791 |
$25,533
505,276
kWh
|
$10,106
-
MMBtu
|
$648
-
MMBtu
|
$(-650.0) | ||
| TOTAL IMPLEMENTED | $34,663 | $17,191 |
$25,207
498,828
kWh
|
$10,106
-
MMBtu
|
- | $(-650.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs