ITAC Assessment: KU0206
ITAC logo
ITAC Assessment: KU0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PAPER BOXES
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 160,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,036 1,010,844
kWh
Natural Gas $15,075 3,751
MMBtu
Fuel Oil #2 $8,000 1,120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,548

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,289 $5,696 $16,289
208,382
kWh
- - -
02 2.7221: Lower temperature during the winter season and vice-versa $4,313 $107 $1,535
19,637
kWh
$2,778
-
MMBtu
- -
03 2.7243: Improve air circulation with destratification fans / other methods $2,935 $1,500 - $2,935
-
MMBtu
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $2,243 - $2,428
31,067
kWh
$515
-
MMBtu
- $(-700.0)
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,155 $4,000 - $2,155
-
MMBtu
- -
06 2.4312: Improve lubrication practices $1,718 $1,515 $1,718
21,981
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $641 - $641
8,206
kWh
- - -
08 2.6214: Shut off pilots in standby equipment $474 - - $434
-
MMBtu
- $40
09 2.1233: Analyze flue gas for proper air/fuel ratio $979 - - $679
-
MMBtu
- $300
10 2.8223: Add air shields to trucks to increase fuel mileage $239 - - - $239
-
MMBtu
-
11 2.4221: Install compressor air intakes in coolest locations $183 $100 $183
2,345
kWh
- - -
12 2.6121: Reduce hot water temperature to the minimum required $115 - $115
1,465
kWh
- - -
TOTAL RECOMMENDED $32,284 $12,918 $22,909
293,083
kWh
$9,496
-
MMBtu
$239
-
MMBtu
$(-360.0)
TOTAL IMPLEMENTED $24,548 $7,403 $18,122
231,829
kWh
$6,147
-
MMBtu
$239
-
MMBtu
$40
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs