ITAC Assessment: KU0188
ITAC logo
ITAC Assessment: KU0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product WALLBOARD PAPER
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 36,440
ton
Production Hrs. Annual 7,944
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $735,120 13,153,869
kWh
Natural Gas $1,221,518 340,259
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,338 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $13,554 $680 $13,554
242,380
kWh
-
02 2.6232: Install set-back timers $2,849 $248 $2,849
50,996
kWh
-
03 2.2122: Install / repair insulation on condensate lines $2,183 $900 - $2,183
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $3,400 $4,600 - $3,400
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,097 $100 $1,097
19,637
kWh
-
06 2.6121: Reduce hot water temperature to the minimum required $255 - $180
3,224
kWh
$75
-
MMBtu
TOTAL RECOMMENDED $23,338 $6,528 $17,680
316,237
kWh
$5,658
-
MMBtu
TOTAL IMPLEMENTED $5,583 $5,500 - $5,583
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs