Assessment Year | 1986 |
---|---|
Principal Product | WALLBOARD PAPER |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 36,440
ton
|
Production Hrs. Annual | 7,944
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $735,120 | 13,153,869 |
kWh
|
$0.056 |
Natural Gas | $1,221,518 | 340,259 |
MMBtu
|
$3.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,338 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,583 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $13,554 | $680 |
$13,554
242,380
kWh
|
- | |
02 | 2.6232: Install set-back timers | $2,849 | $248 |
$2,849
50,996
kWh
|
- | |
03 | 2.2122: Install / repair insulation on condensate lines | $2,183 | $900 | - |
$2,183
-
MMBtu
|
|
04 | 2.2122: Install / repair insulation on condensate lines | $3,400 | $4,600 | - |
$3,400
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,097 | $100 |
$1,097
19,637
kWh
|
- | |
06 | 2.6121: Reduce hot water temperature to the minimum required | $255 | - |
$180
3,224
kWh
|
$75
-
MMBtu
|
|
TOTAL RECOMMENDED | $23,338 | $6,528 |
$17,680
316,237
kWh
|
$5,658
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,583 | $5,500 | - |
$5,583
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs