ITAC Assessment: MA0030
ITAC logo
ITAC Assessment: MA0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product FINE STEEL WIRE
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $5
M
to 10
M
# of Employees 63
Plant Area
n/a
Annual Production 1,440,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,025 1,306,858
kWh
Natural Gas $90,817 14,223
MMBtu
Fuel Oil #2 $34,879 5,908
MMBtu
Fuel Oil #4 $125,011 22,882
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,013 $1,515 $1,013
12,896
kWh
- -
02 2.2511: Insulate bare equipment $1,095 $1,536 - - $1,095
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $135 $214 - - $135
-
MMBtu
04 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $10,416 $8,764 - $10,416
-
MMBtu
-
05 2.2441: Preheat boiler makeup water with waste process heat $9,923 $15,106 - - $9,923
-
MMBtu
TOTAL RECOMMENDED $22,582 $27,135 $1,013
12,896
kWh
$10,416
-
MMBtu
$11,153
-
MMBtu
TOTAL IMPLEMENTED $12,659 $12,029 $1,013
12,896
kWh
$10,416
-
MMBtu
$1,230
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs