Assessment Year | 1985 |
---|---|
Principal Product | FINE STEEL WIRE |
NAICS |
n/a
|
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $5 M to 10M |
# of Employees | 63 |
Plant Area |
n/a
|
Annual Production | 1,440,000
lb
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,025 | 1,306,858 |
kWh
|
$0.078 |
Natural Gas | $90,817 | 14,223 |
MMBtu
|
$6.39 |
Fuel Oil #2 | $34,879 | 5,908 |
MMBtu
|
$5.90 |
Fuel Oil #4 | $125,011 | 22,882 |
MMBtu
|
$5.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,582 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,659 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,013 | $1,515 |
$1,013
12,896
kWh
|
- | - | |
02 | 2.2511: Insulate bare equipment | $1,095 | $1,536 | - | - |
$1,095
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $135 | $214 | - | - |
$135
-
MMBtu
|
|
04 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $10,416 | $8,764 | - |
$10,416
-
MMBtu
|
- | |
05 | 2.2441: Preheat boiler makeup water with waste process heat | $9,923 | $15,106 | - | - |
$9,923
-
MMBtu
|
|
TOTAL RECOMMENDED | $22,582 | $27,135 |
$1,013
12,896
kWh
|
$10,416
-
MMBtu
|
$11,153
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,659 | $12,029 |
$1,013
12,896
kWh
|
$10,416
-
MMBtu
|
$1,230
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs