Assessment Year | 1986 |
---|---|
Principal Product | ENRICHED FLOUR & BRAN |
NAICS |
n/a
|
SIC | 2041: Flour and Other Grain Mill Products |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
n/a
|
Annual Production | 215,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $434,159 | 9,148,007 |
kWh
|
$0.047 |
Natural Gas | $33,295 | 7,818 |
MMBtu
|
$4.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,647 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $4,326 | $4,279 |
$4,326
91,149
kWh
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $4,048 | $6,000 |
$(-668.0)
(-14,068)
kWh
|
$4,716
-
MMBtu
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,213 | - | - |
$2,313
-
MMBtu
|
$(-100.0) | |
04 | 2.4312: Improve lubrication practices | $2,059 | $1,500 |
$2,059
43,376
kWh
|
- | - | |
05 | 2.3212: Optimize plant power factor | $1,423 | $2,500 |
$1,423
-
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $626 | $750 |
$626
13,189
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $264 | $375 |
$264
5,569
kWh
|
- | - | |
08 | 2.6121: Reduce hot water temperature to the minimum required | $132 | - | - |
$132
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $15,091 | $15,404 |
$8,030
139,215
kWh
|
$7,161
-
MMBtu
|
$(-100.0) | ||
TOTAL IMPLEMENTED | $10,647 | $9,029 |
$8,434
147,714
kWh
|
$2,313
-
MMBtu
|
$(-100.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs