| Assessment Year | 1986 |
|---|---|
| Principal Product | ENRICHED FLOUR & BRAN |
| NAICS |
n/a
|
| SIC | 2041: Flour and Other Grain Mill Products |
| Sales Range | $10 M to 50M |
| # of Employees | 74 |
| Plant Area |
n/a
|
| Annual Production | 215,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $434,159 | 9,148,007 |
kWh
|
$0.047 |
| Natural Gas | $33,295 | 7,818 |
MMBtu
|
$4.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,647 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6232: Install set-back timers | $4,326 | $4,279 |
$4,326
91,149
kWh
|
- | - | |
| 02 | 2.2437: Recover waste heat from equipment | $4,048 | $6,000 |
$(-668.0)
(-14,068)
kWh
|
$4,716
-
MMBtu
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,213 | - | - |
$2,313
-
MMBtu
|
$(-100.0) | |
| 04 | 2.4312: Improve lubrication practices | $2,059 | $1,500 |
$2,059
43,376
kWh
|
- | - | |
| 05 | 2.3212: Optimize plant power factor | $1,423 | $2,500 |
$1,423
-
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $626 | $750 |
$626
13,189
kWh
|
- | - | |
| 07 | 2.4133: Use most efficient type of electric motors | $264 | $375 |
$264
5,569
kWh
|
- | - | |
| 08 | 2.6121: Reduce hot water temperature to the minimum required | $132 | - | - |
$132
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $15,091 | $15,404 |
$8,030
139,215
kWh
|
$7,161
-
MMBtu
|
$(-100.0) | ||
| TOTAL IMPLEMENTED | $10,647 | $9,029 |
$8,434
147,714
kWh
|
$2,313
-
MMBtu
|
$(-100.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs