ITAC Assessment: KU0183
ITAC logo
ITAC Assessment: KU0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ENRICHED FLOUR & BRAN
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 74
Plant Area
n/a
Annual Production 215,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $434,159 9,148,007
kWh
Natural Gas $33,295 7,818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $4,326 $4,279 $4,326
91,149
kWh
- -
02 2.2437: Recover waste heat from equipment $4,048 $6,000 $(-668.0)
(-14,068)
kWh
$4,716
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,213 - - $2,313
-
MMBtu
$(-100.0)
04 2.4312: Improve lubrication practices $2,059 $1,500 $2,059
43,376
kWh
- -
05 2.3212: Optimize plant power factor $1,423 $2,500 $1,423
-
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $626 $750 $626
13,189
kWh
- -
07 2.4133: Use most efficient type of electric motors $264 $375 $264
5,569
kWh
- -
08 2.6121: Reduce hot water temperature to the minimum required $132 - - $132
-
MMBtu
-
TOTAL RECOMMENDED $15,091 $15,404 $8,030
139,215
kWh
$7,161
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $10,647 $9,029 $8,434
147,714
kWh
$2,313
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs