Assessment Year | 1985 |
---|---|
Principal Product | MATTRESSES & FOUNDATIONS |
NAICS |
n/a
|
SIC | 2515: Mattresses, Foundations, and Convertible Beds |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,324 | 490,035 |
kWh
|
$0.066 |
Natural Gas | $31,294 | 6,386 |
MMBtu
|
$4.90 |
Other Energy | $23,958 | 2,958 |
MMBtu
|
$8.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,446 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,340 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $972 | - | - |
$1,372
-
MMBtu
|
- | $(-400.0) | |
02 | 2.7261: Install timers and/or thermostats | $4,851 | $2,700 | - |
$4,851
-
MMBtu
|
- | - | |
03 | 2.1123: Install automatic stack damper | $1,700 | $1,950 | - |
$1,700
-
MMBtu
|
- | - | |
04 | 2.7211: Clean and maintain refrigerant condensers and towers | $110 | - |
$135
2,052
kWh
|
- | - | $(-25.0) | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $754 | $200 |
$754
11,430
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,218 | $700 |
$1,218
18,464
kWh
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $174 | $10 |
$174
2,638
kWh
|
- | - | - | |
08 | 2.3212: Optimize plant power factor | $1,714 | $4,000 |
$1,714
-
kWh
|
- | - | - | |
09 | 2.4312: Improve lubrication practices | $232 | $200 |
$232
3,517
kWh
|
- | - | - | |
10 | 2.8223: Add air shields to trucks to increase fuel mileage | $721 | - | - | - |
$721
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $12,446 | $9,760 |
$4,227
38,101
kWh
|
$7,923
-
MMBtu
|
$721
-
MMBtu
|
$(-425.0) | ||
TOTAL IMPLEMENTED | $10,340 | $7,600 |
$3,821
31,946
kWh
|
$6,223
-
MMBtu
|
$721
-
MMBtu
|
$(-425.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs