ITAC Assessment: SD0149
ITAC logo
ITAC Assessment: SD0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3571: Electronic Computers
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 97,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,889 3,162,661
kWh
Electricity Demand $103,039 6,156
kW-mo/yr
Electricity Fees $4,443 -
Natural Gas $21,358 3,012
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,690 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $2,319 $3,090 $2,319
15,826
kWh
- -
02 2.7229: Air condition only space necessary $20,835 - $20,835
239,449
kWh
- -
03 2.3212: Optimize plant power factor $3,817 $1,616 - $3,817 -
04 2.2511: Insulate bare equipment $358 $114 $358
2,931
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,748 $19,039 $7,748
70,047
kWh
- -
06 2.7144: Install spectral reflectors / delamp $8,071 $11,310 $8,071
72,978
kWh
- -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,980 $9,000 - - $3,980
-
lb
08 3.5315: Lease / purchase baler; sell cardboard to recycler $562 - - - $562
-
lb
TOTAL RECOMMENDED $47,690 $44,169 $39,331
401,231
kWh
$3,817 $4,542
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs