Assessment Year | 1985 |
---|---|
Principal Product | RABIES VACCINE |
NAICS |
n/a
|
SIC | 2836: Biological Products, Except Diagnostic Substances |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
n/a
|
Annual Production | 3,500,000
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,148 | 545,721 |
kWh
|
$0.083 |
Natural Gas | $26,770 | 5,824 |
MMBtu
|
$4.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,837 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,110 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $1,551 | $484 |
$751
9,086
kWh
|
$800
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,405 | $2,503 |
$1,405
16,999
kWh
|
- | - | |
03 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $875 | $22 |
$194
2,345
kWh
|
$681
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $576 | - | - |
$676
-
MMBtu
|
$(-100.0) | |
05 | 2.1123: Install automatic stack damper | $414 | $1,300 | - |
$414
-
MMBtu
|
- | |
06 | 2.6214: Shut off pilots in standby equipment | $337 | - | - |
$437
-
MMBtu
|
$(-100.0) | |
07 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $313 | $1,500 | - |
$313
-
MMBtu
|
- | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $191 | - | - |
$391
-
MMBtu
|
$(-200.0) | |
09 | 2.6121: Reduce hot water temperature to the minimum required | $175 | - | - |
$175
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $5,837 | $5,809 |
$2,350
28,430
kWh
|
$3,887
-
MMBtu
|
$(-400.0) | ||
TOTAL IMPLEMENTED | $5,110 | $3,009 |
$2,350
28,430
kWh
|
$3,160
-
MMBtu
|
$(-400.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs