Assessment Year | 1984 |
---|---|
Principal Product | FABRICATED STEEL |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 15,000
ton
|
Production Hrs. Annual | 4,518
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $154,013 | 2,218,640 |
kWh
|
$0.069 |
Natural Gas | $42,010 | 7,369 |
MMBtu
|
$5.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,527 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,813 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,757 | $500 |
$20,757
298,945
kWh
|
- | - | |
02 | 2.7212: Install or upgrade insulation on hvac distribution systems | $4,332 | $800 | - |
$4,332
-
MMBtu
|
- | |
03 | 2.7229: Air condition only space necessary | $3,948 | $700 |
$3,948
56,858
kWh
|
- | - | |
04 | 2.1123: Install automatic stack damper | $1,032 | $1,400 | - |
$1,032
-
MMBtu
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $883 | - | - |
$883
-
MMBtu
|
- | |
06 | 2.6214: Shut off pilots in standby equipment | $866 | - | - |
$946
-
MMBtu
|
$(-80.0) | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $463 | - | - |
$1,163
-
MMBtu
|
$(-700.0) | |
08 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $386 | $400 |
$386
5,569
kWh
|
- | - | |
09 | 2.4312: Improve lubrication practices | $386 | $500 |
$386
5,569
kWh
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $630 | $55 |
$630
9,086
kWh
|
- | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $519 | $200 |
$519
7,620
kWh
|
- | - | |
12 | 2.6121: Reduce hot water temperature to the minimum required | $325 | - | - |
$325
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $34,527 | $4,555 |
$26,626
383,647
kWh
|
$8,681
-
MMBtu
|
$(-780.0) | ||
TOTAL IMPLEMENTED | $23,813 | $700 |
$21,276
306,565
kWh
|
$3,317
-
MMBtu
|
$(-780.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs