Assessment Year | 1983 |
---|---|
Principal Product | CUSTOM CABINETS |
NAICS |
n/a
|
SIC | 2434: Wood Kitchen Cabinets |
Sales Range | $500 k to 1M |
# of Employees | 22 |
Plant Area |
n/a
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 2,074
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,717 | 429,367 |
kWh
|
$0.076 |
Natural Gas | $8,488 | 1,668 |
MMBtu
|
$5.09 |
Other Energy | $5,664 | 563 |
MMBtu
|
$10.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,067 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,512 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.6123: Burn wood by-products for heat | $7,703 | $10,000 | - |
$5,903
-
MMBtu
|
- | $1,800 | |
02 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $931 | $1,100 | - |
$931
-
MMBtu
|
- | - | |
03 | 2.1123: Install automatic stack damper | $372 | $300 | - |
$372
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $223 | $56 |
$223
2,931
kWh
|
- | - | - | |
05 | 2.8226: Increase efficiency of trucks | $171 | $600 | - | - |
$171
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $565 | $210 | - |
$565
-
MMBtu
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $402 | - |
$402
5,275
kWh
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $156 | $150 |
$156
2,052
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,228 | $1,389 |
$1,228
16,120
kWh
|
- | - | - | |
10 | 2.7441: Replace broken windows and/or window sash | $275 | $65 | - |
$275
-
MMBtu
|
- | - | |
11 | 2.6121: Reduce hot water temperature to the minimum required | $41 | - | - |
$41
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $12,067 | $13,870 |
$2,009
26,378
kWh
|
$8,087
-
MMBtu
|
$171
-
MMBtu
|
$1,800 | ||
TOTAL IMPLEMENTED | $10,512 | $11,731 |
$625
8,206
kWh
|
$8,087
-
MMBtu
|
- | $1,800 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs