ITAC Assessment: KU0088
ITAC logo
ITAC Assessment: KU0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product ASPHALT, CONCRETE
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area
n/a
Annual Production 77,000
ton
Production Hrs. Annual 2,250
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,934 227,140
kWh
Natural Gas $53,751 13,115
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $896 $450 - $896
-
MMBtu
02 2.7444: Close holes and openings in building such as broken windows $551 $70 - $551
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $309 $312 $309
3,517
kWh
-
04 2.1123: Install automatic stack damper $111 $300 - $111
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $63 $60 - $63
-
MMBtu
TOTAL RECOMMENDED $1,930 $1,192 $309
3,517
kWh
$1,621
-
MMBtu
TOTAL IMPLEMENTED $551 $70 - $551
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs