ITAC Assessment: KU0081
ITAC logo
ITAC Assessment: KU0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product TOWING TRACTORS
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 250
pieces
Production Hrs. Annual 3,036
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,727 745,311
kWh
Natural Gas $15,417 3,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $3,835 - $1,505
17,878
kWh
$2,330
-
MMBtu
02 2.3212: Optimize plant power factor $1,429 $825 $1,429
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,282 $2,599 $1,282
15,240
kWh
-
04 2.7441: Replace broken windows and/or window sash $1,221 $117 - $1,221
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,036 - $1,036
12,309
kWh
-
06 2.1123: Install automatic stack damper $708 $432 - $708
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $221 $270 - $221
-
MMBtu
08 2.1123: Install automatic stack damper $88 $48 - $88
-
MMBtu
TOTAL RECOMMENDED $9,820 $4,291 $5,252
45,427
kWh
$4,568
-
MMBtu
TOTAL IMPLEMENTED $1,429 $825 $1,429
-
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs