Assessment Year | 1983 |
---|---|
Principal Product | CONCRETE REINFORCED PIPE |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 7,000
thousand feet
|
Production Hrs. Annual | 2,365
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,998 | 1,663,247 |
kWh
|
$0.089 |
Natural Gas | $269,198 | 79,808 |
MMBtu
|
$3.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $115,739 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $109,016 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2424: Use heat in flue gases to preheat products or materials | $51,514 | $55,000 | - |
$51,514
-
MMBtu
|
|
02 | 2.2191: Substitute hot process fluids for steam | $30,320 | - | - |
$30,320
-
MMBtu
|
|
03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,372 | $10,000 | - |
$2,372
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,586 | $1,400 | - |
$8,586
-
MMBtu
|
|
05 | 2.1123: Install automatic stack damper | $4,345 | $912 | - |
$4,345
-
MMBtu
|
|
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,751 | $2,228 | - |
$3,751
-
MMBtu
|
|
07 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $2,986 | $1,142 | - |
$2,986
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,716 | $550 | - |
$2,716
-
MMBtu
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,426 | $6,017 |
$2,426
27,257
kWh
|
- | |
10 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $2,147 | $4,000 | - |
$2,147
-
MMBtu
|
|
11 | 2.7221: Lower temperature during the winter season and vice-versa | $2,094 | - |
$2,094
23,447
kWh
|
- | |
12 | 2.3212: Optimize plant power factor | $1,735 | $970 |
$1,735
-
kWh
|
- | |
13 | 2.3212: Optimize plant power factor | $747 | $540 |
$747
-
kWh
|
- | |
TOTAL RECOMMENDED | $115,739 | $82,759 |
$7,002
50,704
kWh
|
$108,737
-
MMBtu
|
||
TOTAL IMPLEMENTED | $109,016 | $77,249 |
$2,426
27,257
kWh
|
$106,590
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs