ITAC Assessment: KU0076
ITAC logo
ITAC Assessment: KU0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product WATER TREATMENT CHEMICAL
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 7,000,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,211 409,144
kWh
Natural Gas $12,355 4,244
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,241 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,403 $2,308 $2,403
37,515
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $4,328 $2,555 - $4,328
-
MMBtu
03 2.1123: Install automatic stack damper $579 $816 - $579
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $498 $200 - $498
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $433 $380 - $433
-
MMBtu
TOTAL RECOMMENDED $8,241 $6,259 $2,403
37,515
kWh
$5,838
-
MMBtu
TOTAL IMPLEMENTED $5,259 $3,135 - $5,259
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs