ITAC Assessment: MUWT02
ITAC logo
ITAC Assessment: MUWT02
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Wastewater treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $50
M
to 100
M
# of Employees 30
Plant Area 150,000
ft2
Annual Production 27,850,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,132,904 15,194,400
kWh
Electricity Fees $1,621 -
Natural Gas $97,846 14,410
MMBtu
TOTAL YEARLY COSTS $1,232,371
RECOMMENDED SAVINGS* $8,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $98 $20 $98
1,304
kWh
02 2.4322: Use or replace with energy efficient substitutes $294 - $294
3,925
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,011 $15,399 $8,011
106,816
kWh
TOTAL RECOMMENDED $8,403 $15,419 $8,403
112,044
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs