ITAC Assessment: KU0066
ITAC logo
ITAC Assessment: KU0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PAPER BOXES
NAICS
n/a
SIC 2652: Setup Paperboard Boxes
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 30,000
pieces
Production Hrs. Annual 4,750
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,610 495,018
kWh
Natural Gas $7,451 2,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,018

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,340 $3,302 $4,340
67,995
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $1,820 - $860
13,482
kWh
$960
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $957 $1,579 - $957
-
MMBtu
04 2.1123: Install automatic stack damper $560 $582 - $560
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $341 $200 - $341
-
MMBtu
06 2.3212: Optimize plant power factor $1,172 $2,350 $1,172
-
kWh
-
TOTAL RECOMMENDED $9,190 $8,013 $6,372
81,477
kWh
$2,818
-
MMBtu
TOTAL IMPLEMENTED $8,018 $5,663 $5,200
81,477
kWh
$2,818
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs