ITAC Assessment: KU0064
ITAC logo
ITAC Assessment: KU0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product ROUND PAPER CONTAINERS
NAICS
n/a
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 270,000
pieces
Production Hrs. Annual 6,096
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,426 6,811,548
kWh
Natural Gas $93,655 29,965
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,004 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,597

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,639 $8,528 $11,639
198,124
kWh
-
02 2.4323: Use optimum size and capacity equipment $20,021 $5,480 $16,428
279,601
kWh
$3,593
-
MMBtu
03 2.3212: Optimize plant power factor $15,210 $7,760 $15,210
-
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $8,128 $7,500 $8,128
138,335
kWh
-
05 2.7261: Install timers and/or thermostats $6,755 $6,659 - $6,755
-
MMBtu
06 2.2444: Use hot process fluids to preheat incoming process fluids $8,191 $19,400 - $8,191
-
MMBtu
07 2.2443: Re-use or recycle hot or cold process exhaust air $5,136 $8,125 - $5,136
-
MMBtu
08 2.7447: Install vinyl strip / high speed / air curtain doors $4,469 $643 - $4,469
-
MMBtu
09 2.1233: Analyze flue gas for proper air/fuel ratio $2,891 $150 - $2,891
-
MMBtu
10 2.1123: Install automatic stack damper $2,357 $1,365 - $2,357
-
MMBtu
11 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,002 $882 $2,590
43,962
kWh
$(-588.0)
-
MMBtu
12 2.1224: Replace boiler $1,205 $3,200 - $1,205
-
MMBtu
TOTAL RECOMMENDED $88,004 $69,692 $53,995
660,022
kWh
$34,009
-
MMBtu
TOTAL IMPLEMENTED $12,597 $8,143 $8,128
138,335
kWh
$4,469
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs