ITAC Assessment: KU0061
ITAC logo
ITAC Assessment: KU0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product FULLY-COOKED LUNCH MEATS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 4,437
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,644 3,711,899
kWh
Natural Gas $61,527 20,686
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,819 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,078 $3,361 $4,078
107,562
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,765 $1,000 - $2,765
-
MMBtu
03 2.7261: Install timers and/or thermostats $1,549 $1,200 $1,032
27,257
kWh
$517
-
MMBtu
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $4,660 $3,800 $4,660
123,095
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $9,767 $9,000 - $9,767
-
MMBtu
TOTAL RECOMMENDED $22,819 $18,361 $9,770
257,914
kWh
$13,049
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs