ITAC Assessment: KU0053
ITAC logo
ITAC Assessment: KU0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product GRINDING MACHINES
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 4,500,150
pieces
Production Hrs. Annual 8,544
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,821 4,254,396
kWh
Natural Gas $15,261 5,866
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,126 $9,767 $12,126
290,152
kWh
-
02 2.6124: Establish equipment maintenance schedule $24,341 $10,000 $17,591
420,868
kWh
$6,750
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,175 $360 $257
6,155
kWh
$1,918
-
MMBtu
04 2.2532: Use only amount of air necessary to prevent explosion hazard $1,069 $250 - $1,069
-
MMBtu
05 2.3191: Use demand controller or load shedder $9,630 $5,700 $9,630
-
kWh
-
06 2.2511: Insulate bare equipment $674 $90 $674
16,120
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $256 $80 $256
6,155
kWh
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,140 $1,320 - $1,140
-
MMBtu
TOTAL RECOMMENDED $51,411 $27,567 $40,534
739,450
kWh
$10,877
-
MMBtu
TOTAL IMPLEMENTED $41,781 $21,867 $30,904
739,450
kWh
$10,877
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs