ITAC Assessment: KU0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product FOAM PACKING MATERIALS
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area
n/a
Annual Production 750,000
lb
Production Hrs. Annual 6,072
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,815 994,431
kWh
Natural Gas $82,108 30,002
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $368 $450 $368
7,913
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,393 $725 $1,393
29,601
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,083 $3,000 - $4,083
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $3,474 $1,010 - $3,474
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $10,740 $750 - $10,740
-
MMBtu
TOTAL RECOMMENDED $20,058 $5,935 $1,761
37,514
kWh
$18,297
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs