Assessment Year | 1982 |
---|---|
Principal Product | FOAM PACKING MATERIALS |
NAICS |
n/a
|
SIC | 3086: Plastics Foam Products |
Sales Range | $1 M to 5M |
# of Employees | 22 |
Plant Area |
n/a
|
Annual Production | 750,000
lb
|
Production Hrs. Annual | 6,072
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,815 | 994,431 |
kWh
|
$0.047 |
Natural Gas | $82,108 | 30,002 |
MMBtu
|
$2.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,058 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $368 | $450 |
$368
7,913
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,393 | $725 |
$1,393
29,601
kWh
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,083 | $3,000 | - |
$4,083
-
MMBtu
|
|
04 | 2.2136: Install / repair insulation on steam lines | $3,474 | $1,010 | - |
$3,474
-
MMBtu
|
|
05 | 2.2135: Repair and eliminate steam leaks | $10,740 | $750 | - |
$10,740
-
MMBtu
|
|
TOTAL RECOMMENDED | $20,058 | $5,935 |
$1,761
37,514
kWh
|
$18,297
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs