ITAC Assessment: KU0017
ITAC logo
ITAC Assessment: KU0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1981
Principal Product NEWSPAPER/PUBLISHING
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area
n/a
Annual Production 62,050,000
pieces
Production Hrs. Annual 4,380
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,403 4,683,470
kWh
Natural Gas $13,740 5,151
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,124

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,038 $4,000 - $2,038
-
MMBtu
02 2.4323: Use optimum size and capacity equipment $5,749 - $5,749
123,681
kWh
-
03 2.3191: Use demand controller or load shedder $1,230 $2,000 $1,230
-
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,272 $1,000 - $2,272
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,396 $19,385 $9,396
253,810
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,358 $746 - $2,358
-
MMBtu
07 2.7221: Lower temperature during the winter season and vice-versa $6,477 - $6,477
174,971
kWh
-
TOTAL RECOMMENDED $29,520 $27,131 $22,852
552,462
kWh
$6,668
-
MMBtu
TOTAL IMPLEMENTED $20,124 $7,746 $13,456
298,652
kWh
$6,668
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs