ITAC Assessment: KU0016
ITAC logo
ITAC Assessment: KU0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1981
Principal Product INDUSTRIAL & RETAIL CLEANING
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 120
Plant Area
n/a
Annual Production 7,800,000
lb
Production Hrs. Annual 2,040
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,323 703,986
kWh
Natural Gas $79,820 29,097
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,023

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $497 $1,471 $497
9,672
kWh
-
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $748 $928 - $748
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $15,275 $39,000 - $15,275
-
MMBtu
04 2.2444: Use hot process fluids to preheat incoming process fluids $2,861 $1,500 - $2,861
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $180 $450 $180
3,517
kWh
-
06 2.2511: Insulate bare equipment $792 $700 - $792
-
MMBtu
TOTAL RECOMMENDED $20,353 $44,049 $677
13,189
kWh
$19,676
-
MMBtu
TOTAL IMPLEMENTED $16,023 $39,928 - $16,023
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs