ITAC Assessment: KS2544
ITAC logo
ITAC Assessment: KS2544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Plastic (PET) Trays and Containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 410
Plant Area 140,000
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,018,954 28,635,659
kWh
Natural Gas $38,340 56,155
MMBtu
Waste Disposal Costs
Water Usage $41,567 7,424
Tgal
Water Disposal $62,861 7,424
Tgal
TOTAL YEARLY COSTS $2,161,722
RECOMMENDED SAVINGS* $107,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,460 $5,960 $13,460
197,941
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,838 $60 $4,838
71,141
kWh
- -
03 2.4226: Use / purchase optimum sized compressor $13,903 $96,998 $13,903
204,463
kWh
- -
04 2.8121: Apply for tax-free status for energy purchases $6,871 $1,600 - $1,718 $5,153
05 2.9114: Use solar heat to make electricty $68,028 $596,680 $68,028
618,437
kWh
- -
TOTAL RECOMMENDED $107,100 $701,298 $100,229
1,091,982
kWh
$1,718 $5,153
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs