Assessment Year | 2010 |
---|---|
Principal Product | Tungsten Carbide Inserts |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3541: Machine Tools, Metal Cutting Types |
Sales Range | less than $500 k |
# of Employees | 1 |
Plant Area |
40,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 1
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,048,899 | 14,552,320 |
kWh
|
$0.072 |
Natural Gas | $11,563 | 1,326 |
MMBtu
|
$8.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,876 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,872 | $11,208 |
$2,872
41,000
kWh
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,661 | $45,225 |
$10,661
118,456
kWh
|
|
03 | 3.1191: Change procedures / equipment / operating conditions | $8,445 | $1,444 |
$8,445
120,647
kWh
|
|
04 | 2.7145: Install skylights | $16,932 | $88,000 |
$16,932
188,136
kWh
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,966 | $21,900 |
$2,966
42,378
kWh
|
|
TOTAL RECOMMENDED | $41,876 | $167,777 |
$41,876
510,617
kWh
|
||
TOTAL IMPLEMENTED | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs