ITAC Assessment: OR0319
ITAC logo
ITAC Assessment: OR0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Metal roofing materials
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 17
Plant Area
n/a
Annual Production 113,569,368
lb
Production Hrs. Annual 2,600
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,814 244,725
kWh
Electricity Demand $2,104 984
kW-mo/yr
Natural Gas $701 123
MMBtu
LPG $9,000 638
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $265,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $265,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
01 4.452: Eliminate shift $200,000 $2,500 - - - - - - - $200,000
02 4.311: Schedule deliveries according to demand $32,660 $300,000 $750
12,309
kWh
- - - $(-7,500.0) - - $39,410
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $31,569 $931 - - $(-32,500.0)
-
lb
$(-83.0) - $65,000 $(-848.0) -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $833 $1,000 $590
9,672
kWh
$243
-
kW-mo/yr
- - - - - -
05 2.4133: Use most efficient type of electric motors $355 $1,750 $271
5,569
kWh
$84
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $265,417 $306,181 $1,611
27,550
kWh
$327
-
kW-mo/yr
$(-32,500.0)
-
lb
$(-83.0) $(-7,500.0) $65,000 $(-848.0) $239,410
TOTAL IMPLEMENTED $265,417 $306,181 $1,611
27,550
kWh
$327
-
kW-mo/yr
$(-32,500.0)
-
lb
$(-83.0) $(-7,500.0) $65,000 $(-848.0) $239,410
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs