ITAC Assessment: KS2323
ITAC logo
ITAC Assessment: KS2323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Cotton Fibers
NAICS 115111: Cotton Ginning
SIC 0724: Cotton Ginning
Sales Range $10
M
to 50
M
# of Employees 18
Plant Area 216,000
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 1,680
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,140 712,211
kWh
Natural Gas $1,071 74
MMBtu
Waste Disposal Costs
Water Usage $1,220 200
Tgal
Water Disposal $1,496 192
Tgal
TOTAL YEARLY COSTS $154,927
RECOMMENDED SAVINGS* $110,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.9114: Use solar heat to make electricty $105,434 $423,259 $105,434
497,328
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,211 $5,240 $1,211
5,712
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $223 $60 $223
1,052
kWh
04 2.4133: Use most efficient type of electric motors $2,542 $20,493 $2,542
11,989
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,339 $1,860 $1,339
6,317
kWh
TOTAL RECOMMENDED $110,749 $450,912 $110,749
522,398
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs