ITAC Assessment: KG0088
ITAC logo
ITAC Assessment: KG0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Metal valve parts and custom made metal parts
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 38,500
ft2
Annual Production 9,000
pieces
Production Hrs. Annual 6,448
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,632 620,457
kWh
Electricity Demand $17,792 2,224
kW-mo/yr
Electricity Fees $938 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $4,621 $12,410 n/a $3,720
89,097
kWh
$901
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,696 $6,689 n/a $1,216
29,015
kWh
$480
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $892 $450 n/a $892
21,395
kWh
- - -
04 3.5248: Separate and recycle scrap metal to foundry or for sale $4,800 $243 n/a - - $4,800
-
lb
-
05 3.5316: Contract a wood pallet recycling company $3,231 - n/a - - $3,231
-
lb
-
06 3.5316: Contract a wood pallet recycling company $312 - n/a - - $312
-
lb
-
07 4.111: Add equipment/ operators to reduce production bottleneck $37,414 $14,190 n/a - - - $37,414
TOTAL RECOMMENDED $52,966 $33,982 $5,828
139,507
kWh
$1,381
-
kW-mo/yr
$8,343
-
lb
$37,414
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs