ITAC Assessment: MA0795
ITAC logo
ITAC Assessment: MA0795
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Thermoformed Plastic Packaging
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 80,000
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 6,096
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $694,041 5,399,600
kWh
Electricity Demand $66,770 11,592
kW-mo/yr
Electricity Fees $35,349 -
Natural Gas $8,524 583
MMBtu
TOTAL YEARLY COSTS $804,684
RECOMMENDED SAVINGS* $115,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $687

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $100,737 $184,800 $157,272
1,219,164
kWh
$19,561
-
kW-mo/yr
$(-76,096.0)
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,287 $200 $7,287
56,489
kWh
- -
03 2.2511: Insulate bare equipment $6,779 $911 $6,779
52,739
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $687 $2,512 $555
4,306
kWh
$132
-
kW-mo/yr
-
TOTAL RECOMMENDED $115,490 $188,423 $171,893
1,332,698
kWh
$19,693
-
kW-mo/yr
$(-76,096.0)
-
MMBtu
TOTAL IMPLEMENTED $687 $2,512 $555
4,306
kWh
$132
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs