| Assessment Year | 1997 |
|---|---|
| Principal Product | Milk, Juice, Yogurt, purified water |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $100 M to 500M |
| # of Employees | 110 |
| Plant Area |
108,000
ft2
|
| Annual Production | 61,000
bbl
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $897,325 | 18,852,579 |
kWh
|
$0.048 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,275,621 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,138 | $9,000 | n/a |
$5,138
106,975
kWh
|
- | - | - |
| 02 | 2.4133: Use most efficient type of electric motors | $10,851 | $14,980 | n/a |
$10,851
225,967
kWh
|
- | - | - |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,467 | - | n/a |
$4,467
93,200
kWh
|
- | - | - |
| 04 | 2.7261: Install timers and/or thermostats | $2,610 | $900 | n/a |
$2,610
54,220
kWh
|
- | - | - |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,587 | $492 | n/a |
$1,587
31,946
kWh
|
- | - | - |
| 06 | 3.4111: Use closed cycle process to minimize waste water production | $302 | $3,978 | n/a | - |
$302
-
Tgal
|
- | - |
| 07 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $2,530 | - | n/a | - | - |
$2,530
-
lb
|
- |
| 08 | 3.4151: Minimize water usage | $1,136 | $28 | n/a | - |
$1,136
-
Tgal
|
- | - |
| 09 | 4.112: Replace old machine with new automatic multi-station tool | $1,247,000 | $1,765 | n/a | - | - | - | $1,247,000 |
| TOTAL RECOMMENDED | $1,275,621 | $31,143 |
$24,653
512,308
kWh
|
$1,438
-
Tgal
|
$2,530
-
lb
|
$1,247,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs