ITAC Assessment: KG0086
ITAC logo
ITAC Assessment: KG0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Milk, Juice, Yogurt, purified water
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 108,000
ft2
Annual Production 61,000
bbl
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $897,325 18,852,579
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,275,621 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,138 $9,000 n/a $5,138
106,975
kWh
- - -
02 2.4133: Use most efficient type of electric motors $10,851 $14,980 n/a $10,851
225,967
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,467 - n/a $4,467
93,200
kWh
- - -
04 2.7261: Install timers and/or thermostats $2,610 $900 n/a $2,610
54,220
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,587 $492 n/a $1,587
31,946
kWh
- - -
06 3.4111: Use closed cycle process to minimize waste water production $302 $3,978 n/a - $302
-
Tgal
- -
07 3.5212: Regrind, reuse, or sell scrap plastic parts $2,530 - n/a - - $2,530
-
lb
-
08 3.4151: Minimize water usage $1,136 $28 n/a - $1,136
-
Tgal
- -
09 4.112: Replace old machine with new automatic multi-station tool $1,247,000 $1,765 n/a - - - $1,247,000
TOTAL RECOMMENDED $1,275,621 $31,143 $24,653
512,308
kWh
$1,438
-
Tgal
$2,530
-
lb
$1,247,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs