Assessment Year | 1997 |
---|---|
Principal Product | Soft Drinks |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $100 M to 500M |
# of Employees | 1,200 |
Plant Area |
112,000
ft2
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $414,193 | 13,866,354 |
kWh
|
$0.030 |
Electricity Demand | $206,547 | 29,278 |
kW-mo/yr
|
$7.05 |
Electricity Fees | $6,775 | - |
|
- |
Natural Gas | $113,120 | 34,634 |
MMBtu
|
$3.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $9,480 | $150 | n/a |
$9,480
319,168
kWh
|
- | - | - |
02 | 2.4133: Use most efficient type of electric motors | $4,419 | $9,390 | n/a |
$3,347
112,837
kWh
|
$1,072
-
kW-mo/yr
|
- | - |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,539 | $1,034 | n/a |
$2,405
80,891
kWh
|
$1,134
-
kW-mo/yr
|
- | - |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,158 | $8,178 | n/a |
$2,158
72,685
kWh
|
- | - | - |
05 | 2.7135: Install occupancy sensors | $1,988 | $585 | n/a |
$1,988
66,823
kWh
|
- | - | - |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $819 | $2,275 | n/a |
$819
72,978
kWh
|
- | - | - |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,989 | $1,500 | n/a | - | - |
$1,989
-
Tgal
|
- |
08 | 4.423: Move product using mechanical means | $20,237 | $17,500 | n/a | - | - | - | $20,237 |
TOTAL RECOMMENDED | $44,629 | $40,612 |
$20,197
725,382
kWh
|
$2,206
-
kW-mo/yr
|
$1,989
-
Tgal
|
$20,237 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs