| Assessment Year | 1997 |
|---|---|
| Principal Product | Soft Drinks |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $100 M to 500M |
| # of Employees | 1,200 |
| Plant Area |
112,000
ft2
|
| Annual Production | 30,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $414,193 | 13,866,354 |
kWh
|
$0.030 |
| Electricity Demand | $206,547 | 29,278 |
kW-mo/yr
|
$7.05 |
| Electricity Fees | $6,775 | - |
|
- |
| Natural Gas | $113,120 | 34,634 |
MMBtu
|
$3.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $9,480 | $150 | n/a |
$9,480
319,168
kWh
|
- | - | - |
| 02 | 2.4133: Use most efficient type of electric motors | $4,419 | $9,390 | n/a |
$3,347
112,837
kWh
|
$1,072
-
kW-mo/yr
|
- | - |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,539 | $1,034 | n/a |
$2,405
80,891
kWh
|
$1,134
-
kW-mo/yr
|
- | - |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,158 | $8,178 | n/a |
$2,158
72,685
kWh
|
- | - | - |
| 05 | 2.7135: Install occupancy sensors | $1,988 | $585 | n/a |
$1,988
66,823
kWh
|
- | - | - |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $819 | $2,275 | n/a |
$819
72,978
kWh
|
- | - | - |
| 07 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,989 | $1,500 | n/a | - | - |
$1,989
-
Tgal
|
- |
| 08 | 4.423: Move product using mechanical means | $20,237 | $17,500 | n/a | - | - | - | $20,237 |
| TOTAL RECOMMENDED | $44,629 | $40,612 |
$20,197
725,382
kWh
|
$2,206
-
kW-mo/yr
|
$1,989
-
Tgal
|
$20,237 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs