ITAC Assessment: KG0078
ITAC logo
ITAC Assessment: KG0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Soft Drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 1,200
Plant Area 112,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $414,193 13,866,354
kWh
Electricity Demand $206,547 29,278
kW-mo/yr
Electricity Fees $6,775 -
Natural Gas $113,120 34,634
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 2.7261: Install timers and/or thermostats $9,480 $150 n/a $9,480
319,168
kWh
- - -
02 2.4133: Use most efficient type of electric motors $4,419 $9,390 n/a $3,347
112,837
kWh
$1,072
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,539 $1,034 n/a $2,405
80,891
kWh
$1,134
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,158 $8,178 n/a $2,158
72,685
kWh
- - -
05 2.7135: Install occupancy sensors $1,988 $585 n/a $1,988
66,823
kWh
- - -
06 2.2414: Use waste heat from hot flue gases to preheat $819 $2,275 n/a $819
72,978
kWh
- - -
07 3.4116: Meter recycled water (to reduce sewer charges) $1,989 $1,500 n/a - - $1,989
-
Tgal
-
08 4.423: Move product using mechanical means $20,237 $17,500 n/a - - - $20,237
TOTAL RECOMMENDED $44,629 $40,612 $20,197
725,382
kWh
$2,206
-
kW-mo/yr
$1,989
-
Tgal
$20,237
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs