Assessment Year | 2005 |
---|---|
Principal Product | Wire and Construction Nails |
NAICS | 332613: Spring Manufacturing |
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
80,000
ft2
|
Annual Production | 25,000
ton
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $525,734 | 8,739,812 |
kWh
|
$0.060 |
Electricity Demand | $108,165 | 23,078 |
kW-mo/yr
|
$4.69 |
Natural Gas | $177,383 | 28,991 |
MMBtu
|
$6.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $294,860 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $9,477 | $17,705 | - | - |
$9,477
-
MMBtu
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,125 | $9,250 |
$4,487
74,540
kWh
|
$638
-
kW-mo/yr
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,335 | $12,575 |
$5,335
88,625
kWh
|
- | - | - | - | |
04 | 2.2511: Insulate bare equipment | $4,442 | $8,400 | - | - |
$4,442
-
MMBtu
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,107 | $4,600 |
$2,107
34,997
kWh
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,580 | $640 |
$1,385
22,995
kWh
|
$195
-
kW-mo/yr
|
- | - | - | |
07 | 2.4235: Remove or close off unneeded compressed air lines | $1,445 | $230 |
$1,445
23,991
kWh
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,090 | $31,655 |
$23,210
337,709
kWh
|
$2,880
-
kW-mo/yr
|
- | - | - | |
09 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $229,203 | $92,000 |
$(-898.0)
(-14,920)
kWh
|
$(-2,099.0)
-
kW-mo/yr
|
- |
$258,600
-
lb
|
$(-26,400.0) | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $10,056 | $18,500 | - | - | - |
$10,056
-
lb
|
- | |
TOTAL RECOMMENDED | $294,860 | $195,555 |
$37,071
567,937
kWh
|
$1,614
-
kW-mo/yr
|
$13,919
-
MMBtu
|
$268,656
-
lb
|
$(-26,400.0) | ||
TOTAL IMPLEMENTED | $26,090 | $31,655 |
$23,210
337,709
kWh
|
$2,880
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs