ITAC Assessment: MI0011
ITAC logo
ITAC Assessment: MI0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aircraft generator repair
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 38,400
ft2
Annual Production 8,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,125 1,057,805
kWh
Electricity Demand $19,902 2,451
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $619,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $609,256

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 4.122: Develop standard procedures to improve internal yields $59,040 $5,100 - - $59,040
02 4.122: Develop standard procedures to improve internal yields $73,364 $5,100 - - $73,364
03 4.122: Develop standard procedures to improve internal yields $18,892 $5,100 - - $18,892
04 4.322: Eliminate old stock and modify inventory control $114,007 $5,100 - - $114,007
05 4.122: Develop standard procedures to improve internal yields $316,160 $164,000 - - $316,160
06 2.7221: Lower temperature during the winter season and vice-versa $27,793 $19 $7,418
109,093
kWh
$20,375
-
kW-mo/yr
-
07 2.7111: Reduce illumination to minimum necessary levels $10,662 $760 $10,662
95,118
kWh
- -
TOTAL RECOMMENDED $619,918 $185,179 $18,080
204,211
kWh
$20,375
-
kW-mo/yr
$581,463
TOTAL IMPLEMENTED $609,256 $184,419 $7,418
109,093
kWh
$20,375
-
kW-mo/yr
$581,463
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs