ITAC Assessment: KG0075
ITAC logo
ITAC Assessment: KG0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Mail trays, mouse pads, candles, three ring binders and port
NAICS
n/a
SIC 2782: Blankbooks, Looseleaf Binders and Devices
Sales Range $10
M
to 50
M
# of Employees 141
Plant Area 21,840
ft2
Annual Production 8,800,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,488 1,018,464
kWh
Electricity Fees $2,004 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,938

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 3.7221: Improve process control to prevent spills of material $26,746 - $26,746
247,069
kWh
- -
02 2.7261: Install timers and/or thermostats $10,802 $1,350 $10,802
99,648
kWh
- -
03 2.8114: Change rate schedules or other changes in utility service $5,390 - - $5,390 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,653 $972 $3,653
33,705
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,507 $25 $1,507
14,068
kWh
- -
06 3.1172: Revise raw material specs $11,050 - - - $11,050
-
lb
TOTAL RECOMMENDED $59,148 $2,347 $42,708
394,490
kWh
$5,390 $11,050
-
lb
TOTAL IMPLEMENTED $42,938 $1,350 $37,548
346,717
kWh
$5,390 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs