ITAC Assessment: KG0074
ITAC logo
ITAC Assessment: KG0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product parts for electric motor
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $5
M
to 10
M
# of Employees 96
Plant Area 22,704
ft2
Annual Production 10,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,454 3,026,671
kWh
Electricity Demand $15,640 6,730
kW-mo/yr
Electricity Fees $4,877 -
Natural Gas $62,267 12,377
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,181

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,975 $13,250 $11,864
239,156
kWh
$1,111
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $10,914 $14,980 $10,154
204,572
kWh
$760
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,365 $1,750 $2,163
43,669
kWh
$202
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,051 $394 $937
18,757
kWh
$114
-
kW-mo/yr
-
05 2.7261: Install timers and/or thermostats $960 $300 $960
19,343
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $924 $25 $845
16,999
kWh
$79
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $608 $130 $608
14,361
kWh
- -
08 3.4151: Minimize water usage $2,256 $2,850 - - $2,256
-
Tgal
TOTAL RECOMMENDED $32,053 $33,679 $27,531
556,857
kWh
$2,266
-
kW-mo/yr
$2,256
-
Tgal
TOTAL IMPLEMENTED $15,181 $18,524 $12,051
242,672
kWh
$874
-
kW-mo/yr
$2,256
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs