ITAC Assessment: KG0072
ITAC logo
ITAC Assessment: KG0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electric and non electric detonators
NAICS
n/a
SIC 2892: Explosives
Sales Range $10
M
to 50
M
# of Employees 26
Plant Area 24,000
ft2
Annual Production 1,096,000,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,057 1,184,642
kWh
Electricity Demand $5,995 1,874
kW-mo/yr
Electricity Fees $2,944 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.7221: Lower temperature during the winter season and vice-versa $6,148 - $6,148
126,026
kWh
- - -
02 2.7221: Lower temperature during the winter season and vice-versa $3,206 - $3,206
65,651
kWh
- - -
03 2.2449: Recover heat from exhausted steam, hot air or hot water $3,396 $1,500 $3,396
34,877
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,330 $25 $1,216
24,912
kWh
$114
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $1,255 $1,900 $1,160
23,740
kWh
$95
-
kW-mo/yr
- -
06 2.7261: Install timers and/or thermostats $966 $150 $966
19,930
kWh
- - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $955 - - - $955 -
08 3.1192: Reduce scrap production $21,888 $2,000 - - - $21,888
-
lb
TOTAL RECOMMENDED $39,144 $5,575 $16,092
295,136
kWh
$209
-
kW-mo/yr
$955 $21,888
-
lb
TOTAL IMPLEMENTED $7,932 $1,525 $7,818
125,440
kWh
$114
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs