ITAC Assessment: SF0568
ITAC logo
ITAC Assessment: SF0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Machined Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 57,500
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $491,731 4,351,968
kWh
Electricity Demand $293,114 8,465
kW-mo/yr
Natural Gas $1,893 134
MMBtu
TOTAL YEARLY COSTS $786,738
RECOMMENDED SAVINGS* $128,102 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,790

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $40,609 - $40,609
298,818
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $12,914 - $14,514
106,810
kWh
- $(-1,600.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,183 $400 $3,073
22,608
kWh
$1,110
-
kW-mo/yr
- -
04 2.7243: Improve air circulation with destratification fans / other methods $2,048 $860 $1,491
10,972
kWh
$557
-
kW-mo/yr
- -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $26,520 $43,936 $26,520
195,146
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $41,828 $70,690 $23,217
170,836
kWh
$13,200
-
kW-mo/yr
- $5,411
TOTAL RECOMMENDED $128,102 $115,886 $109,424
805,190
kWh
$14,867
-
kW-mo/yr
$(-1,600.0) $5,411
TOTAL IMPLEMENTED $56,790 $71,550 $39,222
288,618
kWh
$13,757
-
kW-mo/yr
$(-1,600.0) $5,411
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs