| Assessment Year | 2014 |
|---|---|
| Principal Product | Metal Heat Treating |
| NAICS | 332811: Metal Heat Treating |
| SIC | 3398: Metal Heat Treating |
| Sales Range | $10 M to 50M |
| # of Employees | 31 |
| Plant Area |
37,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,968
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $184,432 | 1,931,019 |
kWh
|
$0.096 |
| Electricity Demand | $57,154 | 8,271 |
kW-mo/yr
|
$6.91 |
| Natural Gas | $197,223 | 29,578 |
MMBtu
|
$6.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,528 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $404 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $9,479 | $8,763 |
$186
1,949
kWh
|
$9,293
-
MMBtu
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,108 | $4,124 |
$3,108
32,542
kWh
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,895 | $22,758 |
$7,895
82,666
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $404 | $1,967 |
$201
2,107
kWh
|
- | $203 | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,642 | $40,100 |
$8,642
90,486
kWh
|
- | - | |
| TOTAL RECOMMENDED | $29,528 | $77,712 |
$20,032
209,750
kWh
|
$9,293
-
MMBtu
|
$203 | ||
| TOTAL IMPLEMENTED | $404 | $1,967 |
$201
2,107
kWh
|
- | $203 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs