ITAC Assessment: KG0070
ITAC logo
ITAC Assessment: KG0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Concrete pipe and Pre-cast
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $50
M
to 100
M
# of Employees 40
Plant Area 1,020,085
ft2
Annual Production 66,000
ton
Production Hrs. Annual 3,125
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,544 1,572,098
kWh
Electricity Demand $54,944 8,655
kW-mo/yr
Electricity Fees $6,869 -
Natural Gas $35,225 6,767
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,916

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,417 - - - $2,417 -
02 2.4133: Use most efficient type of electric motors $2,060 $4,750 $1,629
26,084
kWh
$431
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,084 $464 $726
11,723
kWh
$358
-
kW-mo/yr
- -
04 2.7261: Install timers and/or thermostats $2,582 $600 $2,582
41,325
kWh
- - -
05 3.1192: Reduce scrap production $3,326 $500 - - - $3,326
-
lb
06 3.1192: Reduce scrap production $24,864 $5,000 - - - $24,864
-
lb
TOTAL RECOMMENDED $36,333 $11,314 $4,937
79,132
kWh
$789
-
kW-mo/yr
$2,417 $28,190
-
lb
TOTAL IMPLEMENTED $33,916 $11,314 $4,937
79,132
kWh
$789
-
kW-mo/yr
- $28,190
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs