ITAC Assessment: KG0067
ITAC logo
ITAC Assessment: KG0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Sausage for private labels.
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 76,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 3,432
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,884 5,081,184
kWh
Electricity Demand $85,886 12,630
kW-mo/yr
Natural Gas $60,116 23,905
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $227,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,704

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $201,031 $1,200,000 $157,872
3,432,298
kWh
$81,600
-
kW-mo/yr
$(-38,441.0)
-
MMBtu
- -
02 2.4133: Use most efficient type of electric motors $4,732 $9,920 $3,501
76,202
kWh
$1,231
-
kW-mo/yr
- - -
03 2.7261: Install timers and/or thermostats $1,761 $600 $1,761
38,394
kWh
- - - -
04 2.2414: Use waste heat from hot flue gases to preheat $1,166 $2,275 - - $1,166
-
MMBtu
- -
05 2.7229: Air condition only space necessary $987 - $343
7,327
kWh
$70
-
kW-mo/yr
$574
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,396 $482 $1,102
24,033
kWh
$294
-
kW-mo/yr
- - -
07 3.4151: Minimize water usage $12,749 $1,904 - - - $12,749
-
Tgal
-
08 3.5315: Lease / purchase baler; sell cardboard to recycler $1,723 $425 - - - - $1,723
-
lb
09 3.5311: Recover and reuse waste material $2,356 $500 - - - - $2,356
-
lb
TOTAL RECOMMENDED $227,901 $1,216,106 $164,579
3,578,254
kWh
$83,195
-
kW-mo/yr
$(-36,701.0)
-
MMBtu
$12,749
-
Tgal
$4,079
-
lb
TOTAL IMPLEMENTED $25,704 $13,831 $6,707
145,956
kWh
$1,595
-
kW-mo/yr
$574
-
MMBtu
$12,749
-
Tgal
$4,079
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs