ITAC Assessment: KG0056
ITAC logo
ITAC Assessment: KG0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product countertops and furniture
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 5,000
ft2
Annual Production 40
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,965 128,370
kWh
Electricity Fees $655 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $3,569 $2,370 $3,569
32,239
kWh
- -
02 2.4131: Size electric motors for peak operating efficiency $1,002 $600 $1,002
9,086
kWh
- -
03 2.7261: Install timers and/or thermostats $507 $150 $507
4,689
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $421 $20 $421
3,810
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $107 $39 $107
879
kWh
- -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,088 $400 - $3,088
-
gal
-
07 3.5311: Recover and reuse waste material $6,750 $20,000 - - $6,750
-
lb
TOTAL RECOMMENDED $15,444 $23,579 $5,606
50,703
kWh
$3,088
-
gal
$6,750
-
lb
TOTAL IMPLEMENTED $4,678 $3,009 $4,678
42,204
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs