Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Shrimp Processing
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $1
M
to 5
M
# of Employees 170
Plant Area 65,522
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,689 5,064,185
kWh
Electricity Demand $156,075 11,544
kW-mo/yr
Electricity Fees $4,655 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,697

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $16,108 $13,600 $4,724
182,298
kWh
$11,384
-
kW-mo/yr
- -
02 2.2696: Use excess cold process fluid for industrial cooling needs $12,871 $6,433 $12,871
109,906
kWh
- - -
03 2.4133: Use most efficient type of electric motors $7,070 $22,830 $2,680
103,458
kWh
$4,390
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $1,525 $18,000 $1,525
34,291
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,099 $361 $320
12,309
kWh
$779
-
kW-mo/yr
- -
06 2.7261: Install timers and/or thermostats $363 $450 $363
14,068
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $178 $20 $52
879
kWh
$126
-
kW-mo/yr
- -
08 3.3122: Use filtration, centrifuging to remove contaminants $73,944 $22,000 - - $73,944
-
Tgal
-
09 3.5311: Recover and reuse waste material $13,420 - - - - $13,420
-
lb
TOTAL RECOMMENDED $126,578 $83,694 $22,535
457,209
kWh
$16,679
-
kW-mo/yr
$73,944
-
Tgal
$13,420
-
lb
TOTAL IMPLEMENTED $37,697 $36,791 $7,724
298,065
kWh
$16,553
-
kW-mo/yr
- $13,420
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs